From: route@monster.com
Sent: Saturday, April 16, 2016 2:06 PM
To: hg@apeironinc.com
Subject: Please review this candidate for: NSN Construction Manager
This resume has been forwarded to
you at the request of Monster User xapeix03
|
|||||||
|
|||||||
|
|
|
||||||
|
||||||
|
Terry Garvin 10633
W. Angels Lane Peoria,
Arizona, 85383 (623)
239-8397 EDUCATION/TRAINING Granda Hills High, Granda Hills,
Ca
Priece Jr College, Woodhills, CA –
Contractor Law CalTec , Glendale, CA – Telcom
Installer Lucent Technologies Training Center –
5ESS
Altamonte Springs, FL –
ALU
NTTC, Denver, CO – Fiber
Optics CERTIFICATIONS · Fiber Optics Certified “Master Technician” · 5ESS Lucent Engineer and equipment Certified · Alltel-Lucent ALU certified · Nokia Certified Level I,II,III “LTE” EMPLOYMENT Northern Light
Speed
Oct. 2016 to Present Field construction
Manager Peoria, AZ · O’Reilly’s POS system “$450K Project” · Remove Old POS system and install new IBM POS system in
155 store in Arizona · Maintain an accurate of all construction actives at all
times and able to communicate the status of all construction actives though
reports, e-mails, meeting and conference calls, etc…. · Establish and maintain a pool of qualified contractors. · Ensure sufficient sub-contractors resources are available
at all times to meet building plan objectives. Manage sub-contractor scope
issues, quality issues and change control processes. · Construction Project Planning, Internal & External
Resource Planning and Lead ship. · Scope development and Understanding of Construction
Processes Ericsson
Nov. 2014 – Oct. 2015 Field Auditor Phoenix, AZ · Expansion of existing MSC to accommodate new equipment.
Supervised crews for Integration of new BTM Switch for expansion, equipment
installation, checkout and integration of new equipment. 276 cell sites
throughout the DSW “Arizona” · Site audit and clean up per Sprint policy · Close out paperwork, turn up site. Alcaltel-Lucent
Oct. 2013 –
Nov. 2014 Construction Manager Phoenix, AZ · Achieve measurable result and report against financial and
non-financial metrics related to various construction activities. · Metric typically include: Scheduling adherence, budget
adherence, quality and employee development. Personally oversee and manage
approximately 125 -250 sites. Serve as the primary internal manager for all
assigned construction activities. Be a subject matter expert on all facets of
the site construction process. Understands internal and external expectation
related to schedule, cost and quality. Drive construction team and
sub-contractors to meet these objectives. · Maintain an accurate of all construction actives at all
times and able to communicate the status of all construction actives though
reports, e-mails, meeting and conference calls, etc…. · Establish and maintain a pool of qualified contractors. · Ensure sufficient sub-contractors resources are available
at all times to meet building plan objectives. Manage sub-contractor scope
issues, quality issues and change control processes. · Construction Project Planning, Internal & External
Resource Planning and Lead ship. · Scope development and Understanding of Construction
Processes. · Strong Negotiation Skills with Sub-Contractors · Basic Understanding of Project Budgeting and Cost
Accounting Methodologies. · Experience in Leading a Team of Construction Field
Personal & Sub- Contractor · Intimate Knowledge of Wireless Construction Methodologies
and Processes within the Market to include: · Risk Management / Mitigation and Creative Problem Solving · Extensive Experience with Network Upgrades and / or
Overlay CDMA,GSH, UMTS, LTE and WiMax · In Dept Understanding of various RF configurations, MW
Backhaul installation and am Fiber Certified level IV “trainer” Nexius
Feb. 2013 – Oct. 2013 Construction Manager AZ/NM · AT&T turf vendor for DSW Ran new site builds and added
on for our client AT&T and Sprint Project. Manage Contractors for project
and meet out milestones, inspection, safety, materials, OOM, RFDS, Drawing
and Planning. · Establish and maintain a pool of qualified contractors. · Ensure sufficient sub-contractors resources are available
at all times to meet building plan objectives. Manage sub-contractor scope
issues, quality issues and change control processes. · Construction Project Planning, Internal & External
Resource Planning and Lead ship. FMHC
Feb. 2012 – Feb. 2013 Construction Manager / Integrator Phoenix, AZ · Training personal on installation for NSN ‘T-Mobil
Project” · UMTS & GSM &PCS<E integrator Level !! and
Level III · Fiber optic testing and cleaning. Moldovcell
Oct. 2011 – Mar. 2012 Integrator
Moldova
· Integration of 3G service for metro area of the city T-Mobile Wireless July 2011 –
Oct 2011 Field Cell Site Construction Supervisor · Expansion of existing MSC to accommodate new equipment.
Supervised crews for Integration of new BTM Switch for expansion, equipment
installation, checkout and integration of new equipment. 276 cell sites
throughout the Brownville, area to San Antonio , Texas, AT&T
May 2010– Jul. 2011 Integrator
Phoenix,
AZ
· Integrator for Alltel-Lucent ALU installation & T1
Extension throughout Arizona and Nevada. MCCI Jun. 2009– Sept. 2010 BTS/Transmission Senior Installer · Private Company; The subcontractor of Public Operator in
Calif (MCCI); Telecommunications industry · Working as BSS engineer for the Maintenance Office ,
troubleshooting and emergency handling of BTS & Node B .Maintenance of
200 Cell Sites ( Nokia Ultra site & Flexi & Lucent 5ESS & Siemens
BTS & Node B & UMTS additions)- GSM Number Hidden MHz & WCDMA -
in Calif & East & North east of Calif (BSS & Transmission such as
Mini Link of Lucent & Siemense Equ. ITI & Nokia Transmission). · Using tools such as: BTS SITE MASTER - ANRISTU- BER METER
- GN NETTEST- GPS - GPS V, GARMIN 12XL- DIGITAL POWER METER – BIRD · -Provide field support for new cell construction in the
following areas: on site supervision, equipment delivery coordination, path
alignment coordination, equipment installation, cell integration, and cell
optimization. Experience in new cell site acquisition preferred (zoning
hearings, site design, regulatory, integration)- Software audits on RNC and
Node Bs & QA all work performed by tower crews in support of the antenna
swaps . · Provide field support for connecting and reconnecting,
disconnecting , upgrading, downgrading, and relocating; and also for
installing , connecting various options available with customer´s equipment
for WCDMA & GSM
Network.
MLC WIRELESS May 2008 – Nov. 2009 Supervisor of installation crews New York, NY · On site supervision, equipment delivery coordination, path
alignment coordination, equipment installation, cell integration, and cell
optimization. METROCOM
Sept. 2007 – April. 2008 Inspector of Fiber Optic cable and
Equipment St Petersburg, Russia · Inspected fiber cable & equipment in the metro tunnels
of St Petersburg and Moscow. Verizon & AT&T
Jan. 2006 – Sept
2007 Cell Site Field Installation
Supervisor Phoenix, AZ · Supervised the modification of the building to support the
new switch and associated equipment SM, AM, BTM’s, (electrical, HVAC, fire
suppression, structural, water detection systems, backup generator systems · 5ESS certified, ECP certified, Fiber Optic certified, DS0,
DS1, DS3, T1-T3, Lucent’s Power Plants (-48 volts to 480 volts) Installation
& Maintenance, Lucent Certified on Wireless Auto/Plex mod cell 2000,
CDMA,UMTS and BTSB station Analog & Digital from single to full blown
system with 16 carriers/ CDMA, video broadcast/WIFI (Verizon, Qwest, Cricket,
Alltel build full network system in Arizona). · Cisco 2620 installation, ALU Router installation and
configuration, working on my CCNA certificate, configuration of OPM and
DAC's, Cat 3 & Cat 5 certified with Lucent Technologies. · Completed Lucent’s training on Phase 1 and Phase II,
Lucent Telessentials Curriculum, and 5ESS Electronic Switching equipment with
completion certificate in the the following: installation of hardware and
software, testing, translation and call through, and adding Growth bays of
the switch system. · I have installed the following: mounting cable racks,
installing DACs, Titians equipment, and doing power-ups, running cable to
equipment and hook-ups. Testing and troubleshooting circuits such as on the
main frame. I am capable of reading and understanding blue prints,
schematics, writing MOPs, cable deliveries, scheduling personal for jobs,
change orders, return equipment orders (JIMs), and service manuals Garvin’s Cabling Group,
LLC
Feb. 2002 – Dec. 2005 Construction Supervisor Peoria, AZ · 44 Monroe Project
– “$1,1 mil project” · Supervisory of Electronic Life safety Crew for “Nestian”
project “44 W. Monroe high rise project · Supervisor installation of Fire Alarm devise in the
residential units for early warn system · Install EST fire panel, programming and testing all devise
and equipment. · APS Project
– “$2,5 mil projectt ” · Supervised APS Sub Station Access Control /Security
Security and IP camera systems · DSX, Pelco, Nitevison, PoE, NVR, Bosch, Notifier,
Southwest Fence Alarm, fiber optics media convertor. · Border Patrol Project –
“$1,6 mil project” · DSX Access control and Camera system . Lucent Technologies
Jun.
1999 – Feb. 2002 NOC Construction Supervisor Phoenix, AZ · Supervised construction crews for Qwest Integration of
5ESS switch and programming (NOC) · Worked with architects and helped with applications for
zoning and building permits. · Made sure blueprints were followed .write MOP, JIM, check
in inventory, scheduling outages · Work included electrical, mounting equipment bays, racks,
run 750 & 500 power cable, sewing cable, Fiber Optics cable, fire
suppression, structural, water detection systems, backup generator systems,
plumbing, scheduling of equipment installation. Protection One
Jan.1990 – Dec-1998 Field Supervisor / Techn Phoenix, AZ · Electronic security technician for Arizona and Las Vegas
area. Installation and Service of security system, doing a lot of take over
and company buy outs. Reprogramming security system, fire alarm and access
control. Working on all diffent panels and makes from : Ademco,
DCS,Napco,Westec,radionics,FBI,Silent Knight, AT&T, Moose, Well Fargo,
etc · Manage truck inventory, maintenance on vehicle, customer
paperwork, service workorder , open and close outs, · customer service, make sure that customer system is
working and area is clean up. Central Alarm “ADT
Services”
Jun. 1987 – Feb. 1990 Commercial Techn V Flagstaff, AZ · Lead Commercial Security technician V, Running service on
Security and Fire alarm systems. Trouble shooting alarm system on customer
business or premise. Trouble shooting using either volt meter, Simpson meter
reading Ac/Dc voltage, open n close loops, PID addressing, or fly wheel, hook
up Dailer and program and test with CS. Following equipment I’ve work on or
as followed; Wells
Fargo, Morse Panel, Moose, Radionics,Westec Firelite,
ESL, Silent Knight, Franklin, Ademco, Napco · Installing Water Flow, Gate Valve, Water Bell, Smoke
Detectors, Heat sensor,Keypads, motion detector, glass breaks, contact and
horns and etc.. · Ran Service & Installation and Sales in the Northern
Arizona Area. Altelco Telecommunication Apr. 1985 – Jun.
1987 Field Installation Supervisor Reno,
NV
· Supervising crews in California for contract with AT&T
and Motel 6 Corporation did installation of PTN service. Doing wiring for
computer phone systems and installing phone jacks, tested all lines to insure
that work done met AT&T and Motel 6 Corporation specifications. Had a
crew of teams (3-4 men per team). We traveled from Southern California to
Northern Washington. The job detail was to insure that all lines were good
and to do final punch down on phone blocks (66 blocks) and establishing phone
service. ADT
Security
Jan. 1979- May 1985 Installer
/ Technician Los
Angeles, Ca
· Installing
ADT security Equipment in residentialand commercial · Prewire
construction for fire, security, intercom, CCTV, and cable · Started
in Los Angeles and then transferred to Bay area · Service
technician for san Meto area · Programming,
break fit customer on the commercial · Truck
inventory, meeting, training, trade shows. |
|
|
||||||||
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
Languages: |
Languages |
Proficiency Level |
|
English |
Fluent |
|
|
Ukrainian |
Advanced |
|
|
|